
AION UT (2025)
400 V 87 kW

The GAC AION V (2025) has a 75.26 kWh usable battery. It charges at up to 11 kW AC (Type 2, three-phase) and up to 180 kW DC (CCS2). A DC charge from 10 to 80 % takes about 24 minutes. The battery runs on a 400 V architecture.
| State of charge | Power |
|---|---|
| 0% | 162 kW |
| 10% | 180 kW |
| 23.1% | 180 kW |
| 80% | 81 kW |
| 100% | 18 kW |
Battery state of charge (horizontal) and DC charging power (vertical). Estimated from the manufacturer's peak DC power and 10–80 % charging time, not measured on this car.
