
AION V (2025)
400 V 180 kW

The GAC AION UT (2025) has a 60 kWh usable battery. It charges at up to 11 kW AC (Type 2, three-phase) and up to 87 kW DC (CCS2). A DC charge from 10 to 80 % takes about 32 minutes. The battery runs on a 400 V architecture.
| State of charge | Power |
|---|---|
| 0% | 78.3 kW |
| 10% | 87 kW |
| 50% | 87 kW |
| 80% | 55.3 kW |
| 100% | 8.7 kW |
Battery state of charge (horizontal) and DC charging power (vertical). Estimated from the manufacturer's peak DC power and 10–80 % charging time, not measured on this car.
